|
 |
|
LOWERING
AND SETTING OFTHE BELLS ON THEIR MOUNTS, INSTALLATION OF THE
STIKER ACCESSORIES AND OF THE ELECTRIC POWER STATIONS.
|
|
|
 |
INSTALLATION
OF THE TIMER, THE COMPUTER WITH KEYBOARD, THE SYNTHESIZER
WITH PROGRAMMATION, AND THE MUSICAL MOTIVES, BY OUR STAFF.
TESTING OF THE INSTALLATION.
|
|